The Manzano mine's main control building which is remarkably similar to the 'Ángulo' of the Las Menas - Los Canos cableway. There is some confusion as to whether this was a machine for controlling wagons on an inclined plane, for a cable system or for compressed air for the mine. | See map. | |
Base onto which was bolted machinery. It is unknown whether this was to control the cable speed or was for compressed air for the pneumatic tools. | See map. | |
Entrance to Mina Manzano. There was a narrow gauge railway which carried the ore to the loading bay. | See map. | |
Inside the mine. | See map. | |
Cutting through which the ore was transported to the cable. | See map. |