← Go back | See all images |
6.91Km. Some ore loading points along this stretch from the mines in the Sierra de Enmedio. Lots of bridges and culverts which is surprising considering that this is one of the flattest sections of the network. One tunnel of 50 metres. This section is very remote and must have caused problems with access during construction.